** CVSTrac Road Map ** Total projected time period for this road map should be approx 6 months. There's a lot of other tickets that could fit in here, too. SQLite 3 support might be sooner than later depending on how complicated a database update tool ends up being. * Very Short Term (1.1.6 or 1.2) * *: merge back ScmTrac stuff (#278) and polish up the UI to be less CVS-specific * Short Term (1.3) * *: CSS support (#231) * Longer Term (2.0) * *: SQLite 3 (#441)