Total projected time period for this road map should be approx 6 months. There's a lot of other tickets that could fit in here, too. SQLite 3 support might be sooner than later depending on how complicated a database update tool ends up being.
* Very Short Term (1.1.6 or 1.2) *
- merge back ScmTrac stuff (#278) and polish up the UI to be less CVS-specific
- features: #357
- bug fixes: #458, maybe #394
* Short Term (1.3) *
- CSS support (#231)
* Longer Term (2.0) *
- SQLite 3 (#441)